2021-2022 - Projects

329th from 51st - 61st

Description: Road Project

Complete 2020

Problem: Roadway.

Solution: Asphalt Overlay.

Learn More


321st from 51st - 61st

Description: Road Project

Complete 2020

Problem: Roadway.

Solution: Asphalt Overlay.

Learn More


48th West of 305th

Description: Road Project

Complete 2020

Problem: Roadway.

Solution: Oil & Chip.

Learn More


36th West of 305th

Description: Road Project

Complete 2020

Problem: Roadway.

Solution: Asphalt Overlay.

Learn More


21st West of 305th

Description: Road Project

Complete 2020

Problem: Roadway.

Solution: Oil & Chip.

Learn More


280th North of 21st

Description: Road Project

Complete 2020

Problem: Roadway.

Solution: Asphalt Overlay.

Learn More

2019 - Projects

41st & 265th Bridge

Description: Bridge Repair

Complete 2019

Problem: Flooding.

Solution: Repairs to road due to flooding.

Learn More


Bluff Landing Road (369th & 71st)

Description: Road Project

Complete 2019

Problem: Flooding.

Solution: Replace pipe and repair road due to flooding.

Learn More


273rd & 58th

Description: Road Project

Complete 2019

Problem: Flooding.

Solution: Replace pipe and repair due to flooding.

Learn More


41st & 284th

Description: Road Project

Complete 2019

Problem: Flooding.

Solution: Replace pipe and repair due to flooding.

Learn More


31st West of 257th

Description: Road Project

Complete 2019

Problem: Flooding.

Solution: Repair road due to flooding.

Learn More


32nd & 290th

Description: Road Project

Complete 2019

Problem: Flooding.

Solution: Repair road due to flooding.

Learn More


390th & 113th

Description: Road Project

Complete 2019

Problem: Flooding.

Solution: Repair road due to flooding.

Learn More


21st 1/2 Mile East of 305th

Description: Road Project

Complete 2019

Problem: Flooding.

Solution: Repair road due to flooding.

Learn More


273rd & 46th

Description: Bridge Repair

Complete 2019

Problem: Flooding.

Solution: Repair bridge due to flooding.

Learn More


65th & 337th

Description: Road Project

Complete 2019

Problem: Flooding.

Solution: Reset half tank and repair road due to flooding.

Learn More


305th & 59th

Description: Road Project

Complete 2019

Problem: Flooding.

Solution: Repair road due to flooding.

Learn More

2018 - Projects

21st Street between 257th & 273rd

Description: Road Project

Complete 2018

Problem: Roadway.

Solution: Asphalt Overlay.

Learn More


305th from Salt Creek Bridge - 51st

Description: Road Project

Complete 2018

Problem: Roadway.

Solution: Asphalt Overlay.

Learn More


353rd (Lonestar) Bridge So. of 101st

Description: Road Project

Complete 2018

Problem: Bridge is functionally obsolete.

Solution: New bridge.

Learn More

2017 - Projects

305th and 8th Salt Creek Bridge

Description: Road Project

Complete 2017

Problem: Bridge is functionally obsolete.

Solution: Currently working with engineers and a design is in progress. Our hopes are to widen and lengthen the bridge to accommodate the creek.

Learn More


Midway (257th) from 41st to 61st

Description: Road Project

Complete 2017

Problem: Roadway.

Solution: Improved roadway with asphalt overlay.

Learn More


289th from 61st - 71st

Description: Road Project

Complete 2017

Problem: Roadway.

Solution: Asphalt overlay

Learn More


Blue Springs 94th and 273rd

Description: Road Project

Complete 2017

Problem: Roadway.

Solution: Asphalt overlay

Learn More


289th from 101st - Muskogee Turnpike

Description: Road Project

Complete 2017

Problem: Roadway.

Solution: Asphalt overlay

Learn More


101st Between 305th - 337th

Description: Road Project

Complete 2017

Problem:

Solution: Cleared fence row, cleaned ditches, and raised the roadway in preparation for Chip & Oil spray.

Learn More

2016 - Projects

Admiral from 225th-257th

Description: Road Project

Complete 2016

Problem: Raodway.

Solution: Paired with Tulsa to improve asphalt roadway and new striping.

Learn More


11th East of 193rd

Description: Road Project

Complete 2016

Problem: Roadway.

Solution: Improved roadway with asphalt overlay.

Learn More


257th Between 31st-41st

Description: New Asphalt Layover

Complete 2016

Problem: Roadway.

Solution: Assisted Tulsa with asphalt overlay, striping, and building up the roads edge.

Learn More

2015 - Projects

21st & 285th

Description: Road Project

Complete 2015

Problem: Flooding.

Solution: Repairs to culvert and roadway due to flooding.

Learn More


21st & 256th

Description: Road Project

Complete 2015

Problem: Flooding.

Solution: Repairs to culvert and roadway due to flooding.

Learn More


Timberbrook Addition

Description: Road Project

Complete 2015

Problem: Flooding.

Solution: Repairs to culvert and roadway due to flooding.

Learn More


295th & 67th

Description: Road Project

Complete 2015

Problem: Flooding.

Solution: Repairs to culvert and roadway due to flooding.

Learn More


104th West of 289th

Description: Road Project

Complete 2015

Problem: Flooding.

Solution: Repairs to culvert and roadway due to flooding.

Learn More


Front Street

Description: Road Project

Complete 2015

Problem: Flooding.

Solution: Repairs to culvert and roadway due to flooding.

Learn More


61st East of 225th

Description: Road Project

Complete 2015

Problem: Flooding.

Solution: Repairs to culvert and roadway due to flooding.

Learn More

2014 - Projects

305th from 71st - 111th

Description: Road Project

Completed in 2014

Problem: Roadway had several poor spots that were worsening.

Solution: Street was asphalted.

Learn More


31st from 193rd to The Creek Turnpike

Description: Road Project

Complete

Problem: Roadway had several poor spots.

Solution: Roadway was re-asphalted.

Learn More


305th from 71st to 51st

Description: Road Project

Complete

Problem: Roadway was deteriorating due to high traffic.

Solution: Asphalted and striped roadway to make a safer travel.

Learn More


111th-from-353rd-369th

Description: Road Project

Complete 2014

Problem: Roadway was very narrow and had several poor spots.

Solution:Roadway was chip and oiled as well as widened for a safer travel.

Learn More

2013 - Projects

289th (15th-16th)

Description: Road Project

Completed 2013

Problem:There was no roadway at 289th E. Ave between 15th and 16th.

Solution:Trees and shrubs were cleared out and a new roadway was established. The road was built up with proper materials and drainage was added.

Learn More


337th and 129th Which is Deer Crossing III

Completed 2013

Description:129th was previously a dirt road with several pot holes we have since Chip and oiled all of 129th onto part of 337th.

Learn More


71st and 305th - 273rd

Description: Road Project

Completed in 2013

Problem: The roadways foundation was uneven.

Solution: Roadway was leveled, asphaulted and striped.

Learn More


337th between 61st & 71st

Description: Road Project

Completed in 2013

Problem: Roadway was previously gravel.

Solution: Chip and Oiled the roadway for road improvements.

Learn More


Lonestar
71st and 121st roadway

Description: Road Project

Completed 2013

Problem/Solution: Roadway improvement / agg base lay down this project was completed in August of 2013.

Learn More


101st between 305th and 353rd

Description: Road Project

Completed in Mid 2013

Problem: Several pot holes and uneven roadway.

Solution: 101st was chip and sealed for improvements.

Learn More


111th between 305th and 353rd

Description: Road Project

Completed in Mid 2013

Problem: Several pot holes and uneven roadway.

Solution: Roadway was chip and sealed for improvements.

Learn More


71st and 293rd Woodland Hills Addition

Description: Road Project

Completed in 2013

Problem: Road way needed to be rejuvenated because it was previously not finished properly.

Solution: Woodland Hills Addition completed in 2013 the county micro sealed the addition for roadway improvements.

Learn More


21st and 280th

Description: Road Project

Completed in 2013

Problem: Roadway was extremely uneven and rough.

Solution: Road was asphalted to create a smoother drive.

Learn More


353rd from 71st - 121st

Description: Road Project

Completed in 2013

Problem: Several poor spots throughout roadway.

Solution: Reparied by asphalting roadway.

Learn More

2012 - Projects

305th East of 51st

Description: Road Project

Completed in 2011-2012

Problem: The road was subject to flooding and damage during rain.

Solution: Elevated road and fixed damage resulting in a safer road for commute.

Learn More


Oneta (241st E. Ave)

Description: Road Project

Completed 2012

Problem: The Road was functionally obsolete, narrow, and unstable to sustain road materials. The creek would rise on to the embankment of the road, which caused flooding.

Solution: The embankment was protected and the road was elevated to prevent flooding. Protecting the embankment and elevating the road provided a wider, safer road for emerency vehicles, school busses, and constituents.

Learn More


101st and 289th E. Ave

Description: Road Project

Completed in 2012

Problem: The road was narrow, functionally obsolete, had improper drainage, and did not have a base. The area was also overgrown with trees and shrubs.

Solution: The road was widened, built up wiht proper road materials, and drainage was fixed. The overgrown trees and shrubs were also cleared out providing a safer road for emergency vehicles, school buses, and constituents.

Learn More


41st between 257th & 273rd

Description: Bridge

Completed in 2012

Problem: The Bridge was subject to flooding and erostion during rain.

Solution: Re-built the Bridge which prevented flooding and damage.

Learn More


Road Striping

Description: Road Project

Completed 2012

Problem: The original striping, on various roads in District 1, faded.

Solution: Roads were re-striped for public safety, to help traffic flow at night and during storms.

Learn More


41st from 241st - 257th

Description: Road Project

Completed in Mid-Late 2012

Problem: Roadway was in need of a smoother overlay due to multiple pot holes.

Solution: Overlayed road with asphalt for a safer travel.

Learn More


104th West of 289th

Description: Road Project

Completed in 2012

Problem: Roadway was in poor condition .

Solution: Chipped and Oiled roadway, and then was Asphalted for a smoother surface.

Learn More


301st North of 81st

Description: Road Project

Completed in 2012

Problem: Road was previously all gravel.

Solution: Chipped and Oiled roadway for a smoother surface.

Learn More


287th South of 101st

Description: Road Project

Completed in 2012

Problem: Road was extremely narrow and had multiple deep potholes.

Solution: Roadway was asphalted for a smoother surface and also widended to help traffic flowage.

Learn More


91st and 305th

Description: Road Project

Completed in 2012

Problem: Roadway is very narrow with overgrown trees.

Solution: Trimmed trees back, build the roadway up, widened and overlayed with asphalt.

Learn More

2011 - Projects

Coal Creek Bridge from 273rd between 81st - 91st
(273rd Oak Grove)

Description: Bridge

Completed in 2011

Problem: Coal Creek Bridge began to fall apart and became dangerous for commuters.

Solution: Re-built Coal Creek Bridge resulting in a safer commute for emergency vehicles, school busses, and constituents.

Learn More


52nd and 281st

Description: Road Project

Completed in 2011

Problem: Roadway was narrow and unsafe for Emergency Vehicles and School Buses.

Solution: The roadway was widened and resurfaced for safer travel.

Learn More


31st / 289th Verdigris Mountain Estates

Description: Road Project

Completed in 2011

Problem: Roadway was uneven and had pot holes.

Solution: Resurfaced to improve travel for residence, buses and emergency vehicles.

Learn More


Spunky Creek Bridge Admiral West of 209th

Description: Road Project

Completed in 2011

Problem: Bridge was causing flood damage.

Solution: Rebuilt for flood prevention and better commuting for citizens and emergency vehicles.

Learn More


25th and 305th

Description: Road Project

Completed in 2011

Problem: Bridge was previously a box culvert and lacked proper flowage.

Solution: ODOT re-constructed bridge for a better flowage and smoother surface.

Learn More


273rd from 31st - 71st

Description: Road Project

Completed in 2011

Problem: Roadway had multiple pout holes and was unlevel.

Solution: Street was Micro Sealed to improve with a leveled surface.

Learn More


81st from 273rd - 305th

Description: Road Project

Completed in 2011

Problem: Roadway was in need of a smoother overlay due to multiple pot holes.

Solution: Overlayed road with asphalt for a safer travel.

Learn More


71st from 369th - 385th

Description: Road Project

Completed in 2011

Problem: Previously was chipped and oiled but has been worn down through time.

Solution: Rechipped and oiled roadway.

Learn More